The loop

Six Steps. One Loop.

Criteria in, evidence out. Every fix is checked by a new real run, and the old result is kept.

Set It Up

From a claimto a recorded verdict

Each step produces something you can inspect later. Nothing is inferred from an agent’s summary or an exit code on its own.

Built

Write the criterion

A title and the behavior you expect, in plain words. Three to five per project, written by a person, never generated.

Title up to 120 characters, expected behavior up to 2,000.

Built

Map a Kane test

Point the criterion at a _test.md file under the managed tests folder. One criterion, one file, so a pass means exactly one thing.

Paths are checked for traversal and symlink escapes.

Built

Run it for real

ProofLoop starts kane-cli testmd run in headless Chrome, streams its output, and waits for the process to close before deciding anything.

One active run at a time. Configurable timeout.

Built

Keep the evidence

Raw stdout and stderr, parsed events and Kane's sealed .evidence pack are stored per run. History is append-only.

A completed run can never be edited or deleted.

Built

Hand off the facts

A report with the expected behavior, what Kane observed, the exit code and evidence references. You copy it to your coding agent yourself.

Copy or download from any finished run. Nothing is sent anywhere.

Built

Re-verify the fix

After you review the agent's change, a new run is a new record. The old failure stays, so the before and after sit side by side.

Compare any two finished runs of a criterion. The page lists differences and claims no cause.

What is builtand what is left

This site describes the whole loop. The list below is the honest state of the code today.

P/00Kane validation

Real pass, fail, parse-error and cancel runs on kane-cli 0.10.9.

Done
P/01App skeleton

Next.js, strict TypeScript, loopback-only server.

Done
P/02Data layer

SQLite, migrations, immutable run snapshots, CRUD API.

Done
P/03Kane adapter

No-shell spawn, capped capture, parser, evidence discovery, redaction.

Done
P/04Verification engine

Run lifecycle, freshness-aware VERIFIED rule, run API.

Done
P/05Dashboard

Project, criterion and run screens inside the workspace.

Done
P/06Agent handoff

Factual report, redaction, copy and download. A real failure, fix and pass of one criterion is recorded.

Done
P/07History and exports

Run history filter, before and after compare, evidence download, JSON and Markdown.

Done
P/08Hardening

Loopback Host guard, security headers, restart and disk-fault tests, clean-clone install check.

Done
P/09Submission

Demo steps and a submission kit are ready. Publishing, the video and posts are yours to do.

Next

Validated on kane-cli 0.10.9

Run. Read. Fix. Re-run.